By: Jay Nugent - WB8TKL - Trenching Cables to the Weather Mast - Latest Update: Aug 30th, 2012

  • Back to the Home of my Weather Pages
  • NWS Standards references and white papers
  • Weather Mast design and construction details
  • Gill Box design and construction details
  • Trench to the weather mast
  • Junction Box to terminate all data/power cables
  • Instruments inside the Gill box
  • Tempurature/Humidity Aspirator
  • Sferic details...
  • Solar Radiadion...
  • Geiger Counter...
  • Bat House details...






Since trenching cables underground is rather labor intensive, bury as many cables as you would ever expect to use! Bury spares in case some varmit nibbles on a wire. It is FAR easier to do it now, than it will be to RE-trench new or additional cables.

I opted to bury the following cables:


These pages are maintained by: jjn@nuge.com

Copyright © 2012 John (Jay) Nugent - WB8TKL
All Rights Reserved. All other Copyrights and
Trademarks are property of their respective owners.


INFORMATION ON THIS WEB SITE IS PROVIDED "AS-IS" WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR NON-INFRINGEMENT. SOME JURISDICTIONS DO NOT ALLOW THE EXCLUSIONS OF IMPLIED WARRANTIES, SO THE ABOVE EXCLUSION MAY NOT APPLY TO YOU.